Saturday, April 13, 2019
Tibmer Jack Essay Example for Free
Tibmer Jack EssayTimberjack was the worlds leading manufacturer of heavy equipment for the professional logger, with an overall market sh be of 25%. In 1995, Timberjack had 1,600 employees, generated sales of 627 MM USD and a net profit of 88 MM USD. Industry Background In the past the forests were trim manual of armsly using the chain saws, and the cut logs were taken out of the forest using horses. The logs were cut as per the needs manually.But in the twentieth vitamin C this started transitioning, and in 1960-1990s there was surge in the use of machinery in forest cutting, loading etc. Timberjack, Blount, Caterpillar, thaumaturgy Deere, and Valmet were the companies providing machinery for cutting forests. Timberjack was the company catering to the 25% of the market share. Product Offering As the old manual chain saw methods for cutting trees were disappearing, feller bunchers, skidders, delimbers and log loaders were used instead.Timberjack provided a variety of heavy equipment that served the peeled method of cutting trees. The price of these equipment was head attached to pulp and lumber prices which in turn are highly dependent on the on the overall strength of the economy Timberjack follows a series of locomote to select and decide its future manufacturing software product package. The process is straightforward, which goes through DFP, seller list, assign vanquish vendor list, site visit and implementation consulting for the final two vendors.Basically, Timberjack is taking one step after another(prenominal) throughout the processes. While it might not be a perfectly precise analogy of scheme development life cycle, it does share characteristics with the traditional waterfall ride of SDLC (system development life cycle). A typical process of traditional SDLC is usually comprised of the following steps 1. Project planning, feasibility study 2. Systems analysis, requirements definition 3. Systems formula 4. Implementation 5. Integrat ion and testing 6. Acceptance, installation, deployment 7. MaintenanceIn Timberjacks case, the life cycle starts with the decision from headquarter that a unify software package will be implemented for the whole organization, even for distributed locations. During this phase, the organization identified its up-to-date short coming of the existing solution and the necessity to move to a new system, as well as cost-benefit implications and a rough schedule. A decision of to build or to buy has also been reached, which is to buy. During the split second phase of the SDLC, there are various types of implementation model.According to Timberjack, it seems that it is following a waterfall model which characterizes with a prolonged need analysis phase. Once a whole list of function requirement is made, it is hardly changed later on. As a matter of fact, Timberjack devoted major term and investment into this phase. The RFP spanned well as long as four months and cost 75,000 USD. Althoug h the RFP was treated as valuable outcome, the effort was slight appreciated by the Sweden operations because they were in need of a quick replacement of their current software system.The following steps of SDLC, including system design, implementation and etc will depend on which vendor Timberjack eventually selected. Therefore, again, Timberjack took the time evaluated and investigated extensively. Timberjack considered several key metrics that were cost, time of development and deployment, flexibility of customization and etc. Using the criteria, Timberjack was able to narrow down the vendor list to two bidders. With further review and consideration, Timberjack would finally be able to locked down one vendor that suited best to their situation.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment